Dholera Discovery

The six Town Planning schemes

Dholera SIR is divided into six Town Planning scheme families, each split into sub-schemes by the Town Planning Officer. This page lists every scheme and every sub-scheme, with the area published for it and the gazette notification, where one was located and read.

Start here

Do you know which scheme you are in?

Most people do not, and that is completely fine. Pick what you do know — including nothing at all. It only improves the conversation; it is never a condition of getting in touch.

Scheme explorer

Every scheme, one at a time

Select a scheme to see its sanction, its sub-schemes, and the notification status of each. The notification state is shown for every sub-scheme, including the ones where none was located.

TP 1

5,109.1 hectares · 51.09 km²

Sanctioned
3 October 2012
Notification
SIRAA/03/2012/566-A
Sub-schemes
6
Notifications read
2 of 6

Sanctions the said Draft Scheme-1 without modifications.

Sub-schemes of TP 1 and the gazette notification for each.
Sub-schemeArea (ha)NotificationVillages named
TP 1A11,198.46Notification readSIRAA/04/2026/01Ambali
TP 1A2867.98Notification readSIRAA/05/2026/02Kadipur, Ambali, Bhadiyad
TP 1A3886.45No notification located—
TP 1A4186.21No notification located—
TP 1A5510.38No notification located—
TP 1B1,459.62No notification located—

This adds TP 1 to your enquiry message. It does not mean you own land in that scheme, or that land or resources are available there.

The complete list

All 27 sub-schemes

Every sub-scheme on the published split-boundary sheet, with the area printed for it and the gazette notification for it. Nothing is filtered out.

Sub-schemes of the Dholera SIR, with the area published on the DSIRDA split-boundary sheet and the gazette notification located for each. Areas in hectares.
Scheme Sub-scheme Area (ha) Notification Reference Published
TP 1 TP 1A1 1,198.46 Notification read SIRAA/04/2026/01 30 Mar 2026
TP 1 TP 1A2 867.98 Notification read SIRAA/05/2026/02 30 Mar 2026
TP 1 TP 1A3 886.45 No notification located — —
TP 1 TP 1A4 186.21 No notification located — —
TP 1 TP 1A5 510.38 No notification located — —
TP 1 TP 1B 1,459.62 No notification located — —
TP 2 TP 2A 1,720.69 Notification located, wording not read SIRAA/26/2018/321 11 Jul 2018
TP 2 TP 2B1 1,585.5 Notification read SIRAA/06/2026/03 30 Mar 2026
TP 2 TP 2B2 682.18 Notification read SIRAA/07/2026/04 30 Mar 2026
TP 2 TP 2B3 650 Notification read SIRAA/08/2026/05 30 Mar 2026
TP 2 TP 2B4A 1,027.35 No notification located — —
TP 2 TP 2B4B 1,648.04 No notification located — —
TP 2 TP 2B5A 1,403.89 No notification located — —
TP 2 TP 2B5B 1,514.83 No notification located — —
TP 3 TP 3A 939.31 Notification read SIRAA/09/2026/06 30 Mar 2026
TP 3 TP 3B 488.88 Notification read SIRAA/03/2025/001 11 Nov 2025
TP 3 TP 3C1 1,227.04 No notification located — —
TP 3 TP 3C2 3,976.67 No notification located — —
TP 4 TP 4A 527.12 Notification located, wording not read SIRAA/25/2018/320 11 Jul 2018
TP 4 TP 4B1 1,069.56 Notification read SIRAA/10/2026/07 30 Mar 2026
TP 4 TP 4B2 4,425.27 No notification located — —
TP 5 TP 5A 1,316.9 Notification read SIRAA/11/2026/08 30 Mar 2026
TP 5 TP 5B 948.3 Notification read SIRAA/12/2026/09 30 Mar 2026
TP 5 TP 5C1 4,375.41 No notification located — —
TP 5 TP 5C2 784.64 No notification located — —
TP 6 TP 6A 634.1 Notification read SIRAA/13/2026/10 30 Mar 2026
TP 6 TP 6B 6,091.78 No notification located — —

27

sub-schemes in total

11

notifications located and read in full

2

notification located, wording not read

Total area under the six schemes: 42,146.56 hectares (421.47 km²). This is the sum of the 27 published sub-scheme areas. It is not the area of the region, which is about 920 sq km.

Bar chart of the area of each of the six Dholera Town Planning schemes, with the number of sub-schemes and notifications read in each, above a complete list of all 27 sub-schemes and their published areas. View full size

The six scheme families by area, and all 27 sub-schemes with their published areas.

Source DSIRDA, 'DSIRDA Split TP Boundary' (sheet created 19 November 2025). Notification references from The Gujarat Government Gazette, Extraordinary, Part IV-C.

Original Top Dholera chart of published figures. It shows no geographic arrangement, because the positions of the schemes are published only on DSIRDA plan sheets that state they may not be reproduced. The per-scheme areas and the total are the sum of the 27 published sub-scheme areas. Not a boundary map and not a cadastral, title or approval reference.

What the statuses mean

Notification read
A gazette notification for that sub-scheme was located and read in full. It sanctions a Preliminary scheme.
Located, wording not read
A notification document exists, but it is a scan with no readable text. Its wording has not been read, so nothing from it is asserted here.
No notification located
No notification for that sub-scheme was located in the reviewed source set. That is a statement about the documents reviewed — it is not a statement that no notification exists.

Notification references shown here reflect documents identified in our reviewed source set. This page is an informational reference and is not a substitute for official planning or legal verification.

Before you rely on any of this

  • The sheet prints an area for each of the 27 sub-schemes. The per-scheme areas and the total are the sum of those printed areas; the sheet prints neither.
  • A notification reference means a notification was located and read in full in the reviewed source set. It is not a statement that no other notification exists.
  • Every notification read sanctions a PRELIMINARY scheme. No final-scheme sanction notification was located for any scheme.
  • TP 2/A's sanction is expressly conditioned on the outcome of PIL No. 227/2014 in the Gujarat High Court.
  • The relative position of the schemes is published only on DSIRDA plan sheets that may not be reproduced, so no arrangement is shown anywhere on this site.

Your requirement

Tell us what you need, and where

If you selected a scheme above it is already attached to your message. If not, send what you know — everything is optional, and we will ask for the rest.

Only the essentials are needed to start. Everything is optional — you can send what you have and we will ask for the rest.

About this

If your project includes workforce, we draw from an active shared-resource pool of approximately 10,000 skilled and semi-skilled workers, including machinery operators, arranged through shared third-party networks. Skills, location, deployment timelines and availability are confirmed against each requirement.

WhatsApp us